Page 19 - HWTC prospektus EN 20220811.cdr
P. 19
Wetland reconstruction in the areas of the Balaton-
Uplands National Park Directorate in Somogy and Zala
County
Tasks:
• Reconstruction of the drainage and regulation system of
the meadows of Somogyszentpáli
• Water reconstruction of the meadows of Pogányvölgy
• Wetland reconstruction planned in the municipalities of
Kiliman and Gelse along the Principal Canal
"Rehabilitation of the Földvári lake in Dávod and the
forest ponds in Karapanca by dredging, bioremediation,
construction of small structures and scrub clearance".
Affected municipalities. Dávod, Hercegszántó
Tasks:
• Dekasa canal and Földvári ponds - dredging
• Renovation of the structures of the Földvári ponds
• Karapancsa forest ponds - dredging and reconstruction
of structures
• Reconstruction of Sztrakity crossing
Improvement of complex habitat protection infrastructure
along the Tápió river basin - construction of associated
structures and embankment and dredging works:
Tasks:
• Construction of a water level control structure
• Construction of a weir for Hajta dam
• Construction of an embankment dam
• Wetland creation
Improvement of the water supply to the Great Island, the
Csadó marsh and the Ipolyszög glacial marsh within the
"Improvement of the complex habitat of the Ipoly valley"
project
Affected municipalities: Drégelypalánk, Balassagyarmat
Preventive measures for the long-term sustainable
management of water quality problems affecting Lake
Balaton
Tasks:
• Development of the Lesence system
• Reconstruction of major structures of the Kis-Balaton
Water Protection System
• Reconstruction of small watercourse structures
www.hunwatertech.com 19