Reconstruction of a water treatment plant in Sri Lanka

Rate this article 0 Vote
Hits: 2772

The goal of this project was the reconstruction of the Kalatuwawa and Labugama water treatment plants supplying drinking water for Colombo city. Keeping the plant functional throughout this process was both challenging and necessary. Design, manufacturing, transport, installation and commissioning were a success and allowed for a smooth transition to running on full capacity.

Water treatment technology:
A complex process of sedimentation, flotation, filtration, chlorination and sludge treatment was implemented in order to achieve the following drinking water production capacity: Kalatuwawa – 90 000 m3/day and Labugama – 60 000 m3/day.

  • Location
    Asia / Sri Lanka / Colombo
  • Date
    2017
  • Customer and operator
    Betonútépítő Co. / Water Board Sri Lanka
  • Participating companies
SU

Super User

  • Male